Before rough plumbing began, our crew wanted clarification regarding the three-function diverter sequence, concealed valve depth, and service access behind the finished wall. Instead of relying solely on printed instructions, we verified every installation detail before proceeding. That planning eliminated uncertainty and prevented unnecessary adjustments once tile work had started. Pressure testing passed successfully on the initial inspection, commissioning required only a minor temperature adjustment, and after more than a year of residential use the diverter, controls, and spray functions continue operating smoothly without maintenance concerns.